Skip to main content

Newsspecng

FG Suspends Lagos-Ibadan Bridge Work After 20-Hour Gridlock

Certificate racketeering: FG to sanction Kenya, Uganda, Niger varsities

Releated Post

The Federal Government has indefinitely suspended the installation of a pedestrian bridge at the Aseese axis of the Lagos–Ibadan Expressway following a 20-hour gridlock that left thousands of motorists stranded.

The project, executed by the Federal Ministry of Works in collaboration with CBC Construction Company, was originally scheduled to run from Wednesday, November 18, to Sunday, November 22.

Earlier, the Ogun State Traffic Compliance and Enforcement Agency (TRACE) announced a temporary diversion of inbound Lagos-bound traffic onto the opposite carriageway at Aseese, with a designated exit point opposite Christ Embassy. However, the arrangement triggered a severe standstill at about 2:00 p.m. on Wednesday that persisted until roughly noon on Thursday.

Commuters faced gruelling delays across the corridor. Passengers travelling from Ibadan after 11:00 a.m. did not reach Magboro until 5:30 p.m., while some motorists spent up to eight hours between Mowe and Magboro. Many abandoned their vehicles to trek long distances, while reckless counter-flow driving further compounded the bottleneck.

Commercial transporters capitalised on the disruption to hike fares sharply. Bus fares from Mowe to Berger surged from the usual ₦700–₦800 to as high as ₦3,000, while commercial motorcyclists charged between ₦5,000 and ₦6,000 for short trips such as Mowe to Ibafo.

Reacting on Wednesday night via Facebook, the Special Adviser to President Bola Tinubu on Media and Communications, Sunday Dare, criticised the contractor for executing the diversion during peak daytime traffic rather than overnight.

‘Tonight – Lagos–Ibadan Expressway. I have been in a traffic gridlock for over five hours trying to get out of Lagos to Ibadan for multiple radio and television appearances ahead of the APC Presidential Rally coming up on Saturday in Ibadan,’ Dare wrote. ‘It beats me why a Chinese contractor would choose the busiest hours of vehicular traffic to construct the bridge and road around this exit point. Stranded cars, thousands of people trekking to get home. What happened to doing construction work during the obituary hours when traffic is lean? This is unnecessary pain. It needs to be corrected.’

Several road users shared similar ordeals online, with truck drivers and daily commuters reporting overnight delays of six to 12 hours along the Abeokuta Interchange, Mowe, and Car Park C axis.

Traffic finally eased around midday on Thursday, prompting TRACE to announce an indefinite halt to the exercise pending a review of traffic management plans.

‘Consequently, all motorists are hereby advised that the temporary traffic diversion associated with the pedestrian bridge construction is suspended, pending further directives from the relevant authorities,’ TRACE spokesperson Babatunde Akinbiyi said in a statement apologising for the disruption.

The acting Controller of the Federal Ministry of Works in Ogun State, Richard Adeleye, also confirmed the suspension on Thursday, stating simply, ‘Yes, it was suspended due to the traffic situation.’

Meanwhile, stranded commuters have urged the Ogun State Government to rehabilitate inner-city link roads to serve as viable bypasses during highway emergencies, while calling on federal authorities to enforce stricter oversight on highway contractors.

Leave a Reply

Your email address will not be published. Required fields are marked *

More Related Posts

Thanks for subscribing to our newsletter